A nonfinancial measure is operating information that has not been translated into dollars.

A) True
B) False

Correct Answer

verifed

verified

Lead time is the process time between start and completion.

A) True
B) False

Correct Answer

verifed

verified

From the foregoing information, determine the manufacturing cost per unit.


A) $240.00
B) $268.00
C) $296.00
D) $1,870.50

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Which of the following is characteristic of the traditional cost system?


A) Many work in process account transactions.
B) Reliance on financial performance measures.
C) Many process control points.
D) All of the above.

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified

In a lean system, the work in process and raw materials inventory accounts are combined.

A) True
B) False

Correct Answer

verifed

verified

Identity the following by their type of quality cost. -Preventive machine maintenance


A) Preventive costs
B) Appraisal costs
C) Internal failure costs
D) External failure costs

E) A) and D)
F) None of the above

Correct Answer

verifed

verified

manufacturing philosophy emphasizes quality and zero defects.


A) Traditional
B) Lean
C) Zero-Based
D) Chinese

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

It is easier to quantify costs of controlling quality than the costs of failing to control quality.

A) True
B) False

Correct Answer

verifed

verified

The lean philosophy views inventory as a necessary buffer to protect against process problems.

A) True
B) False

Correct Answer

verifed

verified

Which of the following results in fewer transactions in lean accounting?


A) all manufacturing costs are combined in one account called Raw and In Process Inventory.
B) the distinction between direct and indirect costs is eliminated.
C) there is less movement of inventory between departments.
D) All of the above.

E) None of the above
F) C) and D)

Correct Answer

verifed

verified

Identity the following by their type of quality cost. -Testing


A) Preventive costs
B) Appraisal costs
C) Internal failure costs
D) External failure costs

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

In a lean system, there are fewer transactions to record than there are in a traditional system.

A) True
B) False

Correct Answer

verifed

verified

Make-to-order companies produce mainly to stock inventory.

A) True
B) False

Correct Answer

verifed

verified

Large batch sizes increase lead time.

A) True
B) False

Correct Answer

verifed

verified

Identity the following by their type of quality cost. -Returned merchandise


A) Preventive costs
B) Appraisal costs
C) Internal failure costs
D) External failure costs

E) All of the above
F) A) and D)

Correct Answer

verifed

verified

A college would like to increase enrollment by streamlining the enrollment process. Which of the following would not fall in line with the college goal?


A) Reduce the requirements necessary to enroll.
B) Relocate counselors, academic advisors, and financial aid specialists for a major to a central location.
C) Cross-train counselors, academic advisors, and financial aid specialists.
D) All of these choices would fall in line with the college goal.

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

One inherent risk to using lean philosophy is that companies are at higher risk of inventory shortage during volatile times such as strikes, weather, etc. than when using the traditional philosophy.

A) True
B) False

Correct Answer

verifed

verified

Schedule of Activity Costs  Quality Control Activities  Activity Cost  Product testing $55,000 Assessing vendor quality 26,000 Recalls 18,000 Rework 29,000 Scrap disposal 8,000 Product design 30,000 Training machine operators 46,000 Warranty work 12,000 Process audits 22,000\begin{array}{|l|l|}\hline \text { Quality Control Activities } & \text { Activity Cost } \\\hline \text { Product testing } & \$ 55,000 \\\hline \text { Assessing vendor quality } & 26,000 \\\hline \text { Recalls } & 18,000 \\\hline \text { Rework } & 29,000 \\\hline \text { Scrap disposal } & 8,000 \\\hline \text { Product design } & 30,000 \\\hline \text { Training machine operators } & 46,000 \\\hline \text { Warranty work } & 12,000 \\\hline \text { Process audits } & 22,000 \\\hline\end{array} -From the above schedule, calculate the a) prevention and b) appraisal costs.

Correct Answer

verifed

verified

a) $102,000 = $26,00...

View Answer

In a lean system, direct labor is included in conversion costs.

A) True
B) False

Correct Answer

verifed

verified

Within-batch wait time increases total lead time.

A) True
B) False

Correct Answer

verifed

verified